Forest road deactivation, removing culverts and installing cross-ditches and waterbars. A practical guide for forest and resource workers

https://library.fpinnovations.ca/en/permalink/fpipub7828
Author
Yorston, Ken
Ravnaas, Eric
Gillies, Clayton
Date
November 2020
Material Type
Guide
Research report
Field
Fibre Supply
. The ditch block prevents water fl ow from continuing down the ditch, so it must be constructed from erosion
Author
Yorston, Ken
Ravnaas, Eric
Gillies, Clayton
Date
November 2020
Material Type
Guide
Research report
Physical Description
2 p.
Sector
Forest Operations
Field
Fibre Supply
Research Area
Transportation & Infrastructure
Subject
Culverts
Water crossings
Water
Stream
Stream management
Sediment control
Roads
Riparian zones
Erosion
Forest roads
Advantage
Series Number
Deactivation pamphlet; 2020
Language
English
Abstract
This guide provides guidance for equipment operators for construction of commonly prescribed road deactivation structures. Timber sale licence (TSL) holders and contractors can use this guide as a reference in achieving conformance to a prepared deactivation plan.