Skip header and navigation

2 records – page 1 of 1.

Characterization of fires in residential buildings

https://library.fpinnovations.ca/en/permalink/fpipub2450
Author
Mehaffey, J.R. (Jim)
Date
March 2007
Edition
39029
Material Type
Research report
Field
Sustainable Construction
Buildings Project Leader: Jim Mehaffey, Building Systems Department, Fire Research Group, Ottawa Laboratory
Author
Mehaffey, J.R. (Jim)
Date
March 2007
Edition
39029
Material Type
Research report
Physical Description
3 p.
Sector
Wood Products
Field
Sustainable Construction
Research Area
Advanced Wood Materials
Subject
Fire
Building construction
Residential construction
Series Number
General Revenue
4918
Location
Québec, Québec
Language
English
Abstract
Fires, Building - Tests
Documents
Less detail

Encapsulation of mass timber floor surfaces, report to Forestry Innovation Investment Ltd.

https://library.fpinnovations.ca/en/permalink/fpipub53043
Author
Ranger, Lindsay
Dagenais, Christian
Bénichou, Noureddine
Date
March 2020
Material Type
Research report
Field
Sustainable Construction
for their valuable input. Thank you to the National Research Council Fire Laboratory for their hard work
Author
Ranger, Lindsay
Dagenais, Christian
BĂ©nichou, Noureddine
Contributor
Natural Resources Canada. Canadian Forest Service
Date
March 2020
Material Type
Research report
Physical Description
55 p.
Sector
Wood Products
Field
Sustainable Construction
Research Area
Building Systems
Subject
Wood
Fire
Design
Building code
Floors
Fire tests
Residential construction
Language
English
Abstract
Currently, mass timber building designs commonly incorporate a concrete floor topping. This can improve building accoustics by increasing the mass of the assembly, reduce floor vibration and create a smooth flat surface to install finish flooring on. The installation of concrete requires formwork, pouring and finishing the concrete and time to cure which adds to project schedules. One way to address this is to use mass timber elements that are prefabricated with concrete toppings preinstalled. Replaceing the concrete floor toppings wiht dry alternatives, such as cement board, may also reduce construction timelines, while still ensuring adequate acoustic and vibration performance. Cement board needs only to be screwed in place and can be walked on immediately after installation; this reduction in construction time may reduce overall project costs and help make wood buildings more cost competitive than other types of construction.
Documents
Less detail