In 1999, FERIC studied a group selection partial cutting operation in an Interior Cedar-Hemlock (ICH) stand, about 90km north of Revelstoke, B.C. A Madill 071 multi-drum cable yarder harvested the site using northbend, gravity skyline (shotgun), and running/scab skyline configurations. The study objective was to evaluate the economics and operational feasibility of using skyline yarding systems for partial cutting in the ICH biogeoclimatic zone. This report describes the results of this case study.