FERIC conducted two trials in northern Alberta to evaluate alternative methods of constructing temporary forest access roads in areas where gravel is scarce and fine-grained soils predominate. The trials compared the performance of V-ditch, 0.5-m Lift, and o.5-m Lift-over-rootmat designs constructed with and without compaction. The report summarizes the key findings from the study for use as a road building reference.