The Forest Engineering Research Institute of Canada (FERIC) monitored and documented the installation of an embedded corrugated-steel pipe culvert as a replacement structure for a perched culvert. Detailed installation procedures and total costs (including planning) for the project are presented. Suggestions for implementation of future embedded culverts are given.