The Bulkley TSA biomass inventory was based on 50-year harvest and road network plans for Crown land provided by the BC Ministry of Forests, Lands and Natural Resource Operations (FLNRO). The biomass yield per hectare predicted for the Bulkley TSA is 25.2 oven-dried tonnes per hectare (odt/ha) from harvest residues. Over the next 50 years a total of 3.48 million odt of available biomass are predicted to be generated by harvest in the Bulkley TSA, or approximately 70,000 odt/yr. Of this, approximately 231,000 odt in total, or 4,600 odt/yr, is expected to be available at the economic price of $60 per oven-dried tonne.