FPInnovations prepared this guide to provide forest and
resource workers with information on culvert installations,
including fish salvage and dewatering considerations for
streambed simulation in closed-bottom structures for
fish streams. This pamphlet is the second in a series; other
important considerations presented in this series for the
successful implementation of a streambed simulation culvert
include planning and design, streambed material/construction,
and monitoring. FPInnovations worked in close co-operation with British Columbia’s Fish Passage Technical Working Group in the development of this guide.