Truck-unloading activities were analyzed at 11 coastal sites. Activities which affected other trucks (queuing, binder removal, unloading, on-line trailer hoist) were separated from those not affecting other trucks (yard travel, weighing, fueling, watering, delays, off-line trailer hoist). Combined unloading times varied 8 minutes for the "fastest" site to 31 minutes for the "slowest".